RBNZ’s Wellington Building Temporarily Closed After Isolated Asbestos Disturbance
0
Assurance testing has since been completed, however the building needs to remain closed while the asbestos disturbance is remediated, as fire sprinkler systems on a key emergency exit floor need to be deactivated.
