Christchurch Wastewater Scheme For Akaroa Faces Criticism Over Projected Overflows
0
The Council had to concede that this was overly optimistic after its own consultants reviewed wastewater flow modelling and found the proposed new system will overflow treated wastewater every 2 to 3 years, sometimes for prolonged periods.