ru24.pro
News in English
Ноябрь
2024

Wakefield Trinity • Ground Improvements

It would appear that a trench has to be dug around the full ground perimeter to accommodate the LED advertising. The fixings have to be "built in" as opposed to surface mounted as part of the IMG reqiurements. Possibly necessitating removal of part of the concrete terracing.

Statistics: Posted by Redscat — Thu Nov 07, 2024 11:01 pm — Replies 114 — Views 24663