ru24.pro
News in English
Октябрь
2024
1 2 3 4 5 6 7 8 9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Contractor ordered to dig up inferior-quality Tal-Barrani road surface

0
A contractor has been ordered to dig up and replace the freshly laid top asphalt layer of Tal-Barrani Road because it did not meet quality standards.Infrastructure Malta said the works are being carried out at the contractor's expense.Resurfacing works on the busy arterial road near Żejtun are being carried out at night on both carriageways.Motorists...