G R Infraprojects wins project of Maharashtra Metro Rail Corporation, Nagpur
The design and construction of Elevated Metro Viaduct of length 17.624 km between Ch. 21256.814 to Ch. 38881.7 including Railway spans of length 79m & 100m and a 6-lane Double decker portion with Vehicular Underpass (VUP) from Ch. 25755.211 to Ch. 26895.211 for a total length of 1.14 km in Reach-1A of NMRP Phase-2.