Renergen brings liquid hydrogen back online following shutdown
Renergen has completed the shutdown, checks, calibrations and corrective actions at its liquid helium facility, in Virginia, in the Free State, and has restarted the facility, resuming liquid helium production as of June 4. An original-equipment manufacturer (OEM) in April brought the helium cold box to the appropriate temperature to liquify helium in batches from wells at the project area. This process involved the purification of the helium to a level of 99.999% purity, which was validated by an independent third-party laboratory.